This font is one of ideas which we may use because the
chunks which have been taken out of the bottom add to the feeling of danger
because to is like the font is falling apart much like the world will after the
explosion because of these connotations I feel this font will be a good choice
for the title of our film The Fallout.
Tuesday, 16 December 2014
Fallout banner
This is our film banner, I think that it is good because it is relevant to our movie genre because it is black which relates to the darkness of the fallout and also it has buildings and our movie is set in a city.
Risk Assessment
Filming Risk Assessment
Activity Assessed: Media Filming
Assessed By: Stephen Harrison
|
||
Activity Location: Greenfinch cottage, Kings Street,
High Ongar
And
Great Baddow High School
Duffield Road Chelmsford Essex CM2 9RZ |
Who’s at Risk: The Actor and people filming ( Steve,
Lee and Charlie)
Approved By:
|
|
Hazard
|
Risk Level
|
Control Measures
|
Cutting yourself on the brambles and thorns while walking
towards the camera
|
3
|
Wear long trousers and long sleeve shirts I order to
reduce the risk of lacerations. Take care whole walking to ensure you don’t
trip up and therefore fall over cutting yourself further.
|
Tripping over
|
5
|
Watch out what you are walking on because the ground is
slippery because of the recent wet weather conditions take care and walk
slowly to minimize the risk of falling over because you will not be rushing
around.
|
Pneumonia from wet feet
|
7
|
Keep feet warm by wearing thick socks. Wear shoes which
are water resistant or water proof to help keep water off of your feet
ensuring they don’t get too cold and if they become too cold and wet come
back and change your footwear and socks to keep warm.
|
Personal Protective Equipment Needed:
N/A
|
Provided By:
N/A
|
Level of First Aid Provision Needed:
Basic low level first aid required to deal with small cuts
and scratches should we scratch ourselves.
|
First Aiders:
School first aider in student admin
|
Emergency Telephone Numbers:
1. 999 – For
ambulance Police and Fire service
2. 01245
265821 – School Phone number
|
Nearest A&E:
Broomfield Hospital
Court Road Broomfield Chelmsford Essex CM1 7ET |
Monday, 15 December 2014
Titles for film
These are the titles in order which we will use in our film because we want to make sure they are all correct. I have looked through the credits from zombielander and these are what come up in the film because of this i am certain that they are correct and there will be no mistakes enabling us to attain full marks for our credits.
Production Company (3 Seconds)
In Association with ( 3 Seconds)
Big Talk Productions ( 3 Seconds)
Charlie ( 3 Seconds)
Steve ( 3 Seconds)
Lee ( 3 Seconds)
Fallout ( 4 Seconds)
Costumes By ( 3 Seconds)
Costume Designer ( 3 Seconds) -
Music By ( 3 Seconds)
Edited By ( 3 Seconds)
Production Designer ( 3 Seconds)
Director of Photography ( 3 Seconds)
Executive Producer ( 3 Seconds)
Produced By ( 3 Seconds)
Written By ( 3 Seconds)
Directed By ( 3 Seconds)
Production Company (3 Seconds)
In Association with ( 3 Seconds)
Big Talk Productions ( 3 Seconds)
Charlie ( 3 Seconds)
Steve ( 3 Seconds)
Lee ( 3 Seconds)
Fallout ( 4 Seconds)
Costumes By ( 3 Seconds)
Costume Designer ( 3 Seconds) -
Music By ( 3 Seconds)
Edited By ( 3 Seconds)
Production Designer ( 3 Seconds)
Director of Photography ( 3 Seconds)
Executive Producer ( 3 Seconds)
Produced By ( 3 Seconds)
Written By ( 3 Seconds)
Directed By ( 3 Seconds)
Monday, 1 December 2014
Production Diary
Week 1 :
3/11/2014 - In this meeting we got in got into our groups in
order to discuss and hand out roles which people will be doing in order to get
the ball rolling on the production.
4/11/2014 - In this meeting we began the story board process
by researching different films which have the same themes which we intend to
incorporate into our film.
6/11/2014 - In this meeting we began to create our
mood board and our film pitch, we created our film pitch to show the class our
idea and to help us gain ideas for our target audience.
7/11/2014 - In this meting we evaluated our film pitch in
order to determine our target audience. From this evaluation we found that our
class liked the idea of apocalypse and the nuclear bomb disaster.
10/11/2014 - In this meeting we came to finish our
mood-board this gave us some costume ideas and location ideas which we began to
look for on google maps. We did this to find some areas which looked suitable
for our film.
11/11/2014 - We found out that we had the use of a remote
control car in this meeting because of this we have adjusted out storyboard
because after viewing the footage we could capture we felt it would add a good
tracking shot because it is very steady.
12/11/2014 - In this meeting we decided to get some recce
shots of our locations in order to figure out where we wanted to film and if we
are able to film in the locations we want to.
13/11/2014 - In this meeting we began our titles research in
order to see what fonts we want to put into our titles to give them the correct
feel. We are making a list and then we are going to ask our group which one we
feel will fit best in meaning we will get the best results.
14/11/2014 - In this lesson we organised our lap charts
which would help us become more organised and ensure we know what we are
suppose to be doing to ensure we get all the paperwork done and finished before
we go out to film. I said i would do the Synopsis plan of our film and thew
risk assessments.
17/11/2014 -In this meeting we voiced over the story board
to upload onto my blog and to everyone else blog.
18/11/2014 - For this meeting we decided on our shooting
locations we will mainly be filming in Ongar in Essex. We have access to a
large barn in which we can film.
20/11/2014 - We sent Lee to take some recce shots of the
location because t is close to his house and will give us ideas of what shots
we can film. We decided that we would need a clear dry day in order to give our
film the correct feel.
21/11/2014 - This meeting involved us checking through our
work which we could then make changes if they are required to improve our own
work.
24/11/2014 - In this session I started to complete the risk
assessment so we could begin filming our production. Without the risk
assessment we cannot film because it could be unsafe.
25/11/2014 - We started to complete the shooting schedule in
this meeting knowing exactly what shots we need to film on our shooting
days.
26/11/2014 - I began to finish the risk assessment for our
production so we can upload it onto our blogs, after this we can film our
production.
27/11/2014 - Our shooting schedule was finished in this
session so we could begin to shoot, we are going to begin our shooting this
weekend and are hoping to edit next week to get it finally finished.
28/11/2014 - We began shooting during this meeting to bring
all of our footage together and then begin editing on premiar to bring our
whole film together allowing us to meet our deadline. we have been shooting in
the location pictured below because it looks like the aftermath of a nuclear
explosion with no life present.
1/12/2014 - In this meeting we started to finish our filming meaning we can begin to edit in order to speed up our production ensuring we meet our deadline and edit our film in the most professional way possible.2//12/2014 - In this meeting we started to finish our editing using the software to use a grayscale effect on the footage to give an impression of a derelict wasteland with no life because black is a colour which is associated with death meaning the audience will know what has happened even though they may not have seen it.3/12/2014 - This meeting consisted of adding titles to our film in the correct manner so that all of the titles are correct and none are missing therefore allowing us to reach the highest marks we possibly can. During this we watched the zombieander credits to base ours on the same idea following the same pattern of credits.4/12/2014 - We finished our editing and titles during this meeting because of this we exported our film to youtube in order to put it on to our blog for the examiner to watch and then mark.5/12/2014 - We received class feedback in this meeting showing the whole class our film awaiting there comments which can help us improve our own film.Week 2 :Week 3 : Week 4 : Week 5 :
Our Filming Location:
![]() |
Our Filming Location |
1/12/2014 - In this meeting we started to finish our filming
meaning we can begin to edit in order to speed up our production ensuring we
meet our deadline and edit our film in the most professional way
possible.2//12/2014 - In this meeting we started to finish our editing using
the software to use a grayscale effect on the footage to give an impression of
a derelict wasteland with no life because black is a colour which is associated
with death meaning the audience will know what has happened even though they
may not have seen it.3/12/2014 - This meeting consisted of adding titles to our
film in the correct manner so that all of the titles are correct and none are
missing therefore allowing us to reach the highest marks we possibly can.
During this we watched the zombieander credits to base ours on the same idea
following the same pattern of credits.4/12/2014 - We finished our editing and
titles during this meeting because of this we exported our film to youtube in
order to put it on to our blog for the examiner to watch and then
mark.5/12/2014 - We received class feedback in this meeting showing the whole
class our film awaiting there comments which can help us improve our own
film.Week 2 :Week 3 : Week 4 : Week 5 :
Subscribe to:
Posts (Atom)